Quick contact info

SYDNEY Yard
2C Factory Street
Granville NSW 2142
1300 385 839

BRISBANE Yard
23 Aranda Street
Slacks Creek QLD 4127
1300 385 839

Mon-Fri: 7am-5pm
Sat-Sun: Closed

info@deconcut.com
Accounts: accounts@perfectgroup.au

DeconCut

Our Projects

Every project in our portfolio represents a cutting challenge that required more than standard methods. From TBM dismantling and refinery shutdowns to bridge structures and remote mining plant, these are the complex, high-consequence scopes where engineered methodology and specialist execution made the difference.

DeconCut operates as part of Perfect Group.

The projects below were delivered by Perfect Group crews using the same people, plant and methodology-first approach that DeconCut brings to every industrial cutting scope.
Major plant working on a complex infrastructure demolition site

Decommissioning an acoustic shed above a live Sydney Metro station box at Burwood

Perfect plant processing demolished concrete beside the gantry crane and structural steel over the station box. Period: October 2024 to March 2025 An acoustic shed and its internal structures removed

Column capital removal area under a back-propped soffit at 42 North Steyne, Manly

Structural cutting at 42 North Steyne, Manly: column capitals and a beam removed flush to the soffit

A capital taken back flush with the underside of the slab, with the floor above carried on back-propping throughout. Structure: Multi-level concrete building under major structural modification A live, fully

Wire saw operators making a vertical cut in a reinforced concrete wall with slurry containment at the Prospect Pre-Treatment Plant

Wire sawing a live channel wall at the Prospect Pre-Treatment Plant

Wire sawing the channel wall. Slurry captured at the cut with silt socks and pumped out for treatment. A 23 metre long reinforced concrete wall opening, cut and lifted out

DeconCut operates as part of Perfect Group. The projects below were delivered by Perfect Group crews using the same people, plant and methodology-first approach that DeconCut brings to every industrial cutting scope.

Wire saw operators making a vertical cut in a reinforced concrete wall with slurry containment at the Prospect Pre-Treatment Plant

Wire sawing | Live water asset

Prospect Pre-Treatment Plant, Horsley Park NSW

A 23 m by 4 m reinforced concrete wall opening cut in seven panels inside an operating Sydney Water plant for the Suez Acciona JV. Wire saws, stitch cores, 400 tonne crane lifts, no impact breaking, waterstops untouched.

Read the case study

Column capital removal area under a back-propped soffit at 42 North Steyne, Manly

Structural cutting | Live structure

42 North Steyne, Manly NSW

Column capitals chased in a 200 mm grid with an inverted wall saw and a beam removed flush to the soffit on a fully propped live structure, with a tower crane overhead.

Read the case study

Major plant working on a complex infrastructure demolition site

Decommissioning | Live metro interface

Sydney Metro West, Burwood NSW

An acoustic shed deconstructed above an operational station box for the Acciona Ferrovial JV. Reverse-sequence steel, dual-crane lifts and vibration-free cutting, with zero hours lost to the client's programme.

Read the case study

Talk to a real personCall now

aboriginal flagsDeconCut acknowledges the Aboriginal and Torres Strait Isander people as Traditional Custodians of the country on which we live and work. We pay our respects to the Traditional Custodians and Elders past, present and future, and honour their connection to the land and ongoing contribution to society.